Blog Post

Aurora Central High School – Lighting Renovation

  • By RMK Electric
  • 26 Jan, 2013
This project includes a complete lighting renovation throughout the entire school replacing all existing light fixtures with programmable/dimmable energy efficient fixtures and occupancy sensors.  Through the lighting renovation the school was able to reduce energy costs significantly.  The school had specific hours when RMK was allowed onsite so as not to disrupt the students learning environment and to limit student interaction.  Work hours were limited to evenings and weekends, each room had to be restored to pre-work condition before class started the next day.   RMK acted as the general contractor for the entire project, performing all of the electrical work with our own forces as well as hiring and overseeing the other trades that were needed to accomplish the project.
Project Name:   Aurora Central High School- Lighting Renovation
Location: 11700 E. 11th Avenue Aurora, CO 80010
Electrical Value:  $446,000.00
Share by: