Blog Post

Nist High Speed

  • By RMK Electric
  • 26 Jan, 2013
The Nist High Speed project required the installation of secondary wiring for bypass around the highspeed switch.  RMK subcontracted NPL to install all of the high voltage.  This installation required a weekend shutdown for the full Nist campus which is over 13 buildings for tie ins to new gear.  After installation RMK was able to bring power seamlessly back online.
Project Name: Nist High Speed
Location: Nist Boulder, CO
Electrical Value: $227,000.00
Share by: