The NIST Generators project required the addition and replacement of emergency generators.  RMK installed 3…

Eastside Human Services

Posted By RMK Electric / January, 26, 2013 / 0 comments

The Eastside Human Services facility is 51,000 square feet, sits on a 4.7 acre lot…

Nist Flow Loop Lab

Posted By RMK Electric / January, 25, 2013 / 0 comments

The Nist Flow Loop Lab project included the renovation to bring the Flow Loop area…

Buckley LDC

Posted By RMK Electric / January, 26, 2013 / 0 comments

This project is located on the Buckley Air Force Base.   It features a 16,900 square…

Stapleton Fire Station

Posted By RMK Electric / October, 11, 2012 / 0 comments

This project encompasses a 13,129 square foot main level and 1,771 square foot basement. The…

Nist 24

Posted By RMK Electric / January, 25, 2013 / 0 comments

The Nist 24 project required the installation of parking lot lighting throughout the parking lot…

Nist High Speed

Posted By RMK Electric / January, 25, 2013 / 0 comments

The Nist High Speed project required the installation of secondary wiring for bypass around the…

Nist Site Fire Alarm Improvements

Posted By RMK Electric / January, 25, 2013 / 0 comments

RMK provided numerous fire alarm adds and crossovers applications to the 13 buildings at the…

Nist Building 2 Pump Room

Posted By RMK Electric / January, 25, 2013 / 0 comments

Building 2 pump room required the replacements of an existing transformer and associated power distribution…

Nist Green Mountain

Posted By RMK Electric / January, 25, 2013 / 0 comments

The Nist Green Mountain service installation required new underground service feeders to be run approximately…

Nist Solar lighting Repairs

Posted By RMK Electric / January, 25, 2013 / 0 comments

This project required the removal and replacement of 18 fixture heads on existing stand- alone…

Nist Building 2 Lab 1105

Posted By RMK Electric / January, 25, 2013 / 0 comments

The Building 2 Lab 1105 project required RMK to add electrical and mechanical utilities to…

Nist Fort Collins Emergency Lighting

Posted By RMK Electric / January, 25, 2013 / 0 comments

RMK replaced all existing emergency lighting (emergency and exit) and also ran new conduit and…

Nist Metering Buildings 26 and 42

Posted By RMK Electric / January, 25, 2013 / 0 comments

Nist Metering Buildings 26 and 42 required installation of new metering systems for building 26…

Nist Building 1 Room 2234E

Posted By RMK Electric / January, 25, 2013 / 0 comments

This project included upgrading the electrical and mechanical utilities to serve the new equipment requirements…

Nist WWVB

Posted By RMK Electric / January, 25, 2013 / 0 comments

The Nist WWVB project included the replacement of approximately 600’ of underground electrical conductors from…